Job Description:
Electrical, Instrumentation & Demolition Works
Project Duration:
November 2019 – December 2021
Project Highlights:
- Manhours: 113.000
- Manpower Peak: 60
- Key Quantities Installed
- Electrical Works
MV/LV Panels: 35 no.
Transformers: 9 no.
MV/LV Cables Laying: 178.000 lm
MV/LV Cables Connection: 3.076 no.
Lighting Fixtures: 831 no.
Equipment: 326 no.
Motors Test: 400 no. - Instrumentation Works
Field Instruments: 1.170 no.
Control Valves: 460 no.
Loop Checks: 3.283 no. - Demolition Works
MV/LV Panels: 28 no.
Transformers: 9 no.
Equipment: 334 no.
Field Instruments: 1.150 no.
Control Valves: 690 no.
Instruments & Cables Inspection: 2.800 no.
- Electrical Works