PPE Plant Recommissioning Project (Netherlands)

Client:
SABIC Innovative Plastics / Fluor

Location:
Bergen op Zoom (Netherlands)

Job Description:
Electrical, Instrumentation & Demolition Works

Project Duration:
November 2019 – December 2021 

Project Highlights:

  • Manhours: 113.000
  • Manpower Peak: 60
  • Key Quantities Installed
    • Electrical Works
      MV/LV Panels: 35 no.
      Transformers: 9 no.
      MV/LV Cables Laying: 178.000 lm
      MV/LV Cables Connection: 3.076 no.
      Lighting Fixtures: 831 no.
      Equipment: 326 no.
      Motors Test: 400 no.
    • Instrumentation Works
      Field Instruments: 1.170 no.
      Control Valves: 460 no.
      Loop Checks: 3.283 no.
    • Demolition Works
      MV/LV Panels: 28 no.
      Transformers: 9 no.
      Equipment: 334 no.
      Field Instruments: 1.150 no.
      Control Valves: 690 no.
      Instruments & Cables Inspection: 2.800 no.