Job Description:
Electrical & Instrumentation Works
Project Duration:
January 2016 – July 2018
Project Highlights:
- Manhours: 250.000
- Manpower Peak: 120
- Key Quantities Installed
- Electrical Works
Cable Conduit/Trays: 742 lm
Grounding System: 3.090 lm
MV/LV Cables Laying: 30.050 lm
MV/LV Cables Connection: 880 no.
Lighting Fixtures: 460 no.
Electrical Heat Tracing: 960 lm - Instrumentation Works
Cable Conduit/Trays: 836 lm
Ins Cables Laying: 29.000 lm
Junction Boxes: 217 no.
Instruments Calibration: 1.643 no.
Field Instruments: 942 no.
Loop Checks: 2018 no.
- Electrical Works