aVia Stentinello, 9. 96100 - Syracuse (SR) - Italy

a+39 0931 787111

PROJECTS

LNG Terminal Project (Netherlands)

Client:
SENER / TECHINT

Location:
Rotterdam (Netherlands)

Job Description:
Electrical & Instrumentation Works

Project Duration:
February 2010 – August 2011

Project Highlights:

  • Manhours: 180.000
  • Manpower Peak: 200
  • Key Quantities Installed
    • Electrical Works
      Cable Conduits: 10.000 lm
      Cable Trays: 7.500 lm
      Grounding System: 15.000 lm
      MV/LV Cables Laying: 300.000 lm
      Lighting Fixtures: 245 no.
      Equipment: 86 no.
    • Instrumentation Works
      Cable Conduits: 2.000 lm
      Cable Trays: 20.000 lm
      Ins Cables Laying: 460.000 lm
      Junction Boxes: 450 no.
      Field Instruments: 1.500 no.
      Control Valves: 200 no.